Item SG 137/19-FINAL - CRITERIA CONCERNING WAR HEADQUARTERS CONSTRUCTION PROGRAMMES

Open original Digital object

Identity area

Reference code

SG 137/19-FINAL

Title

CRITERIA CONCERNING WAR HEADQUARTERS CONSTRUCTION PROGRAMMES

Date(s)

  • 1952-10-21 (Creation)

Level of description

Item

Extent and medium

1 page

Context area

Name of creator

(1949-1966)

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

NATO publicly disclosed information is available for research and education purposes. Any commercial use requires the written permission of NATO. Please credit the NATO Archives should any documents be used for publication. Guidelines for the proper citation of NATO publicly disclosed information can be found on the NATO Archives website (http://www.nato.int/archives).

Conditions governing reproduction

Language of material

  • English
  • French

Script of material

Language and script notes

Physical characteristics and technical requirements

Finding aids

Generated finding aid

Allied materials area

Existence and location of originals

Existence and location of copies

Related units of description

Related descriptions

Notes area

Alternative identifier(s)

Access points

Subject access points

Place access points

Name access points

Genre access points

Description control area

Description identifier

Institution identifier

NAO

Rules and/or conventions used

Status

Level of detail

Dates of creation revision deletion

Language(s)

Script(s)

Sources

Digital object (Master) rights area

Digital object (Reference) rights area

Digital object (Thumbnail) rights area

Accession area