Series AC/19 - Committee of the Annual Review

ANNUAL REVIEW OF NATO DEFENCE BUILD-UP - ACTION REQUIRED AND DRAFT TIME SCHEDULE REVISION ANNUELLE DE LA CONSTITUTION DES FORCES DE DEFENSE DU NATO - MESURES NECESSAIRES ET PROJE... ANNUAL REVIEW OF NATO DEFENCE BUILD-UP - ACTION REQUIRED AND DRAFT TIME SCHEDULE MESURES NECESSAIRES ET PROJET DE CALENDRIER DES TRAVAUX POUR LA REVISION ANNUELLE DU PLAN DE CONS... NOTIFICATION OF 1ST MEETING NOTIFICATION DU 1ERE REUNION ORGANIZATION FOR THE ANNUAL REVIEW ORGANISATION DE LA REVUE ANNUELLE STANDING GROUP'S PROPOSED FORCE GOALS IN RELATIONS TO LISBON GOALS OBJECTIFS DE FORCES PROPOSES PAR LE GROUPE PERMANENT EN RAPPORT PAR CEUX APPROUVES A LISBONNE REPORT BY THE WORKING GROUP ON THE QUESTIONNAIRE COVERING DRAFT QUESTIONNAIRE FOR THE 1952 ANNUAL... REPORT BY THE WORKING GROUP ON THE QUESTIONNAIRE COVERING DRAFT QUESTIONNAIRE FOR THE 1952 ANNUAL... RAPPORT DU GROUPE DE TRAVAIL SUR LE QUESTIONNAIRE, RELATIF AU PROJET DE QUESTIONNAIRE POUR LA REV... CORRIGENDUM 1 - REPORT BY THE WORKING GROUP ON THE QUESTIONNAIRE COVERING DRAFT QUESTIONNAIRE FOR... STOCK-TAKING AS OF 30TH JUNE 1952 - WORKING GROUP REPORT INVENTAIRE AU 30 JUIN 1952 STOCK-TAKING AS OF 30TH JUNE 1952 - WORKING GROUP REPORT INVENTAIRE AU 30 JUIN 1952 CORRIGENDUM 1 - STOCK-TAKING AS OF 30TH JUNE 1952 - WORKING GROUP REPORT PRELIMINARY REPORT FROM THE WORKING GROUP ON THE QUESTIONNAIRE RAPPORT PRELIMINAIRE DU GROUPE DE TRAVAIL SUR LE QUESTIONNAIRE NEXT STEPS IN THE ANNUAL REVIEW - NOTE BY THE UNITED KINGDOM PROCHAINE ETAPE DE LA REVISION ANNUELLE SCREENING IN THE ANNUAL REVIEW SELECTION EFFECTUEE AU COURS DE LA REVISION ANNUELLE
Results 1 to 25 of 1332 Show all

Identity area

Reference code

AC/19

Title

Committee of the Annual Review

Date(s)

  • 1952 - 1967 (Creation)

Level of description

Series

Extent and medium

1324 PDF

Context area

Name of creator

(1952-1967)

Administrative history

The AC/19 chronological series contains the records of the Committee of the Annual Review. At the conference held in Lisbon in February 1952, the Council decided that the relevant NATO bodies should undertake an ongoing review of the requirements arising from the creation of an adequate defence capability (C9-D/20 dated 23 February 1952). The Council and the International Staff should be organized in such a way that the requirements of NATO programmes would coincide with the real possibilities of implementation at the political and economic levels. With a view to supervising and coordinating all activities in this area, the Council decided at its meeting of 6 May 1952 to set up a working group on the annual report under the chairmanship of the Deputy Secretary General (C-R(52)2).This working group, which was soon to acquire committee status(1) (ISM(52)29), met for the first time on 8 May 1952 under the chairmanshipof Mr H. van Vredenburch, Deputy Secretary General. The Committee of the Annual Review comprised representatives of all the NATO member nations, together with representatives of the International Staff and the Standing Group Liaison Office.The role of the Committee was to supervise the organization of the annual review in order to ensure that political and military directives were implemented. One of the aims of the annual review was to form a clear idea of the defence effort of each nation. The first meetings were mainly devoted to the organization of the annual review and the establishment of working groups(2). Thereafter, each year, the Committee laid downthe procedure, set the work schedule and issued instructions for the overview report to the Council. During its meetings it examined the information provided by member nations in response to the questionnaire on their defence status. The annual review underwent a number of modifications over the years, but in general the procedures changed very little.By the beginning of the 1960s the annual review procedure had become very time-consuming, and nations began to question its efficiency(3). In January 1960, the Council tasked the Steering Group(4) with studying possible modifications to the annual review to make it both simpler and more efficient. The Group’s report proposed that the review should be carried out on a triennal rather than annual basis, so that nations’ defence programmes could be re-assessed every three years in the light of NATO’s global requirements. Circumstances prevented the triennial procedure from being fully implemented.From 1963 onwards, the annual/triennal review ceased to be a priority and was eclipsed by the preparations for forming long-term plans for NATO as decided at the Ottawa ministerial meetings. Under the new procedure, the Committee should adopt a horizontal approach to problems rather than focusing on the situation in each country. The last annual review organized by AC/19 was in 1966. The Committee of the Annual Review was disbanded and replaced by the Defence Review Committee as from 1967(5).

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

The records in the AC/19 chronological series contain information concerning the annual review. This includes information on the defence plans (up to 1970) of member nations as regards their forces and defence budget, as well as assumptions concerning the relationship between economic development and their future defence effort. The AC/19 series documents cover the structure of land, naval and air forces, as well as nuclear forces. They deal with questions of national force goals, command and control, force enhancement and expansion, and mobilization. They also include studies of possible scenarios, proposals and instructions concerning the gathering of information on national defence plans and concerning the presentation of force goals, draft resolutions on defence plans, activity reports for the Defence Planning Committee, etc.

Appraisal, destruction and scheduling

Accruals

System of arrangement

The records in the AC/19 series are assembled by type - Notice (N), Working Paper (WP), Document (D), and Record (R) - and then by number.

Conditions of access and use area

Conditions governing access

NATO publicly disclosed information is available for research and education purposes. Any commercial use requires the written permission of NATO. Please credit the NATO Archives should any documents be used for publication. Guidelines for the proper citation of NATO publicly disclosed information can be found on the NATO Archives website (http://www.nato.int/archives).

Conditions governing reproduction

Language of material

Script of material

Language and script notes

The documents of the AC/19 chronological series were generally circulated in both NATO official languages (English and French).

Physical characteristics and technical requirements

Finding aids

Allied materials area

Existence and location of originals

Existence and location of copies

Related units of description

Related descriptions

Notes area

Note

(1) During its first three months of operation, the Committee’s title varied. While the English documents referred to the "Committee of the Annual Review“ from the outset, the designation "Comité de la révision annuelle” was to be found in French documents up to the end of August 1952.
(2) See the AC/39 series.
(3) For further details see the description of the Annual Review series.
(4) See the AC/159 series.
(5) See the DRC, DPQ and DPC series.

Alternative identifier(s)

Access points

Subject access points

Place access points

Name access points

Genre access points

Description control area

Description identifier

Institution identifier

NAO

Rules and/or conventions used

Status

Level of detail

Dates of creation revision deletion

Language(s)

Script(s)

Sources

Accession area